Water preprocessor: Difference between revisions
No edit summary |
No edit summary |
||
Line 216: | Line 216: | ||
<math>WaterResTotalRenew_c=x*LANDAREA_c</math> | <math>WaterResTotalRenew_c=x*LANDAREA_c</math> | ||
Subtract overlap between surface and groundwater out | Subtract overlap between surface and groundwater out. Initialize overlap with SeriesWaterResOverlap. | ||
<math>WatResTotalRenewSurface_c=\dfrac{WatResTotalRenewSurface_c}{WaterResTotalSurfaceGround_c}*(WaterResTotalSurfaceGround_c-Overlap_c)</math> | <math>WatResTotalRenewSurface_c=\dfrac{WatResTotalRenewSurface_c}{WaterResTotalSurfaceGround_c}*(WaterResTotalSurfaceGround_c-Overlap_c)</math> |
Revision as of 14:58, 11 January 2017
Series pulled into water preprocessor
Table | Definition | Source | Notes | Last IFs Update |
SeriesWaterFossilWithdrawal | Water withdrawal from fossil water aquifers | UNESCO Non-Renewable Groundwater Report 2006 | SGH | 2014/08/29 |
SeriesWaterResFossil | Water withdrawal from fossil water aquifers | UNESCO Non-Renewable Groundwater Report 2006; Aquastat country profiles | SGH | 2014/08/29 |
SeriesWaterResGroundAfrica | Water withdrawal from fossil water aquifers for African countries | Quantitative maps of groundwater resources in Africa | SGH | 2014/08/29 |
SeriesWasterwaterTreated | Wastewater: treated volume (10^9 m3/yr) |
AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesWastewaterProduced | Wastewater: produced volume (10^9 m3/yr) |
AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesWastewaterTreatedReused | Treated wastewater reused (10^9 m3/yr) |
AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesWaterDesalinated | Desalinated Water Produced | AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesWaterGroundWithD | Ground Water Withdrawal | AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesWaterResExploitGround | Exploitable: regular renewable groundwater (10^9 m3/yr) | AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesWaterResExploitSurface | Exploitable: total renewable surface water (10^9 m3/yr) | AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesWaterResOverlap | Overlap between surface and groundwater | AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesWaterResTotalExploit | Water resources: total exploitable | AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesWaterResTotalRenew | Water resources: total renewable (actual) | AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesWaterResTotalRenewGround | Total renewable groundwater (actual) (10^9 m3/yr) | AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesWaterResTotalRenewSurface | Total renewable suface water (actual) | AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesWaterSurfaceWithD | Surface Water Withdrawal | AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesWaterTotalWithdSources | Total water withdrawal (summed by sources) | AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesWaterWithdAgriculture | Agricultural water withdrawal | AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesWaterWithdIndustrial | Industrial water withdrawal | AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesWaterWithdMunicipal | Municipal water withdrawal | AQU BATCH PULL | KK,JM | 2016/05/21 |
SeriesLandIrActual%Equip | Area equipped for irrigation: actually irrigated, % | AQU BATCH PULL | KK;JM | 2016/06/06 |
Initializations
Municipal water demand
Use SeriesWaterWithdMunicipal to initialize municipal water demand (WatWithdMun).
If null, then calculate urban population:
Then estimate municipal water demand using the equation: "MunDemandPC (Linear) versus GDP2011PCPPP(MOSTRECENT) (Log) AND Connections" which is in AnalFunc.
Multiply municipal water demand per capita by the size of the urban population.
Industrial water demand
Use SeriesWaterWithdIndustrial to initialize industrial water demand (WatWithdInd).
If null, then estimate using manufacturing value added. The equation is, "WaterWithdIndustrial(MOSTRECENT minus elec) (Linear) versus Man (Linear)" and is in TablFunc.
Agricultural water demand
Initialize agriculture water demand using SeriesWatWithdAg.
If null, then set to 0.
Land irrigated
Initialize land irrigated (LANDIRAREAACTUAL) using SeriesLandIrActual%Equip.
If null, set to 90 (percent).
Multiply by land equipped for irrigation:
If LANDIRAREAACTUAL is still null, then set to 0.001.
Water withdrawal growth rates
Initialize water withdrawal growth rates (WaterWithdrawalSurfaceGR, WaterWithdrawalGroundGR, WaterWithdrawalFossilGroundGR) using the "getAnnualGrowthRate" function and the tables: SeriesWatWithdSurface, SeriesWatWithDGround, and SeriesWatWithDFossilGround.
Total renewable resources
Initialize total renewable surface water resources (WatResTotalRenewSurface) using SeriesWaterResTotalRenewSurface.
If null, set to 0.
Initialize total renewable groundwater resources (WatResTotalRenewGround) using SeriesWaterResTotalRenewGround.
If null, set to 0.
Initialize total renewable water resources (WatResTotalRenew) using SeriesWaterResTotalRenew.
If null set to 0.
Fill holes
If WatResTotalRenewGround is 0 but WatResTotalRenewSurface and WaterResTotalRenew do not equal 0, then:
If WatResTotalRenewSurface is 0, but WatResTotalRenewGround and WaterResTotalRenew do not equal 0, then:
If WaterResTotalRenew is 0, but WatResTotalRenewGround and WatResTotalRenewSurface do not equal 0, then:
If we still do not have any value for WaterResTotalRenew, then estimate using land area:
Subtract overlap between surface and groundwater out. Initialize overlap with SeriesWaterResOverlap.