Rebuild Base Notes: Difference between revisions

From Pardee Wiki
Jump to navigation Jump to search
No edit summary
m (removed dead link)
 
(3 intermediate revisions by one other user not shown)
Line 5: Line 5:
The goal is to rebuild the base using new update, i.e. all series, to see how new update affects the forecasts. At the end, rebuild the base with all of the pre-processor series to see how the forecasts change.
The goal is to rebuild the base using new update, i.e. all series, to see how new update affects the forecasts. At the end, rebuild the base with all of the pre-processor series to see how the forecasts change.


'''1. Save working file.'''<br/>Make sure to always copy IFsbase.run before rebuilding model (can rename such as IFsbase – oldnov13.run in Data file; it is always good to put a date here for ease later). Or in other words, save the working file. This is so you can compare forecasts between the old series and the new updated series to see if there are any significant changes
'''1. Save working file.'''<br/>Make sure to always copy IFsbase.run before rebuilding model (can rename such as IFsbase – oldnov13.run in Data file; it is always good to put a date here for ease later). Or in other words, save the working file. This is so you can compare forecasts between the old series and the new updated series to see if there are any significant changes.
[[index.php?title=File:08172020_rebuild_base1.png|center|800x800px]]




'''[[File:08172020 rebuild base1.png|800x500px|RTENOTITLE]]'''


2.&nbsp;'''Replace files'''
2.&nbsp;'''Replace files'''
Line 18: Line 17:


*Select “Extended Features,” “Rebuild Model Base,” “Rebuild Base”, Click “Ok.”
*Select “Extended Features,” “Rebuild Model Base,” “Rebuild Base”, Click “Ok.”
**​[[File:08172020 rebuild base2.png|800x500px|RTENOTITLE]]
**Choose “Last Year” 2100. Leave “Using Bilateral Data” checked. Rebuilding changes values for 2015; need to run model to 2100 to change forecasts
**Select “Rebuild Base”
**Click “Ok” for prompt that states “As model beings rebuilding the base, it will process some large data files that will cause the hard disk to work intensively.
**Contact your supervisor if you are not able to do this step.


 
'''4. Rewrite base case and rerun through 2100'''
 
 
 
 
 
 
 
 
 
[[File:08172020 rebuild base2.png|800x500px|RTENOTITLE]]
 
 
<ul style="margin-left: 40px;">
<li>Choose “Last Year” 2100. Leave “Using Bilateral Data” checked. Rebuilding changes values for 2015; need to run model to 2100 to change forecasts</li>
<li>Select “Rebuild Base”</li>
<li>Click “Ok” for prompt that states “As model beings rebuilding the base, it will process some large data files that will cause the hard disk to work intensively.</li>
</ul>
 
Contact your supervisor if you are not able to do this step.
 
'''4. Rewrite base case and rerun through 2100.'''


Once done with this step, you can save your base case with new name.
Once done with this step, you can save your base case with new name.
&nbsp;
&nbsp;

Latest revision as of 22:38, 16 February 2023

 

Steps to Rebuild Model Base (for top down approach):

The goal is to rebuild the base using new update, i.e. all series, to see how new update affects the forecasts. At the end, rebuild the base with all of the pre-processor series to see how the forecasts change.

1. Save working file.
Make sure to always copy IFsbase.run before rebuilding model (can rename such as IFsbase – oldnov13.run in Data file; it is always good to put a date here for ease later). Or in other words, save the working file. This is so you can compare forecasts between the old series and the new updated series to see if there are any significant changes. center|800x800px


2. Replace files

Go to a folder where IFs reside. Normally for windows, they are under “C drive\Users\IFs… .” Replace existing “IFsHistSeries.mdb” and “DataDict.mdb” with new “IFsHistSeries.mdb” and new “DataDict.mdb.”

3. Rebuild Base

  • Select “Extended Features,” “Rebuild Model Base,” “Rebuild Base”, Click “Ok.”
    • RTENOTITLE
    • Choose “Last Year” 2100. Leave “Using Bilateral Data” checked. Rebuilding changes values for 2015; need to run model to 2100 to change forecasts
    • Select “Rebuild Base”
    • Click “Ok” for prompt that states “As model beings rebuilding the base, it will process some large data files that will cause the hard disk to work intensively.
    • Contact your supervisor if you are not able to do this step.

4. Rewrite base case and rerun through 2100

Once done with this step, you can save your base case with new name.