File:Section 5 Equation 1 in 5.4.2.1 Basic Export calculation.png
Jump to navigation
Jump to search
Section_5_Equation_1_in_5.4.2.1_Basic_Export_calculation.png (682 × 180 pixels, file size: 34 KB, MIME type: image/png)
As described above, the preliminary (before constraint) calculation of dyad and sector specific exports is simply the calculated value from the previous year multiplied by the ratio of the gravity function’s calculations in the forecast year relative to that of the previous year (with changes in the drivers between the two years).
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | ★ Approved revision 18:20, 8 May 2023 | 682 × 180 (34 KB) | Julia.Detar (talk | contribs) |
You cannot overwrite this file.
File usage
There are no pages that use this file.